Our Projects
Here’s a few reasons why you should choose us
| Client | Project Details | Status (Completed/Ongoing) |
|---|---|---|
| National Water Supply and Drainage Board | Construction of balance work for 1500 m3/d package water treatment plant in Medadumbara WSS |
Ongoing |
| Chunnakam | Construction of 500m3 Sump & Pump House, Chlorinator & Guard House Chunnakkam, Jaffna Project Belongs to The NWSDB Jaffna. |
Ongoing |
| Brown & Company PLC | Construction of Proposed new service center and repair workshop |
Ongoing |
| Luminex | 6.7m HL Concrete pole production for Luminex PLC |
Ongoing |
| Gamma Interpharm (Pvt) Ltd | Office building at Union Place, Colombo 08 |
Ongoing |
| SLT | SLT 6.7m Pole Precast & production |
Ongoing |
| Ishara Traders (Pvt) Ltd | Proposed Flagship Showroom for Browns Motors at Kirulapone |
Ongoing |
| Vidull Biomass II (Pvt) Ltd | Civil works of Medawachchiya 6.6 MW Biomass Power Project |
Ongoing |
| Prashakthi Energy (Wilachchiya) (Pvt) Ltd | Civil , MEP & PEB Structural works for the Wilachchiya 4.5MW Biomass Power Plant, Anuradhapura |
Ongoing |
| National Water Supply and Drainage Board | Laying of pipes of Matara stage 4 Distribution Water Supply Project (Charlimount Zone 01 and Mailimbada Zone 01) |
Ongoing |
| Ministry of Water Supply | Laying HDPE pipes along with facilitating house connection work in the Deliwala Water Supply Scheme in Monaragala, Sri Lanka. |
Ongoing |
| Road Development Authority | Constructing a 14.45km road covering Yatawatta, Madawala, Ulpatha – Sri Lanka. |
Ongoing
View Gallery
|
| Road Development Authority | Constructing a 5.2km road in Kolonna, Batathimbura, Sri Lanka. |
Ongoing |
| Road Development Authority | Constructing a 4.8km road in Embilipitiya, Padalangala, Sri Lanka. |
Ongoing
View Gallery
|
| Riverina Resorts (Pvt) Ltd. | Functioning as the Project Management Consultant in constructing the proposed 5-star beach resort Riverina. The beach resort consists of 359 Rooms and a host of public and recreational spaces. |
Ongoing |
| Eden Hotel Lanka PLC | Functioning as the Project Management Consultant in refurbishing Occidental Eden, Beruwala, a premier beach resort in Sri Lanka. The refurbishment project covers the entire scope of the property: 158 rooms and public areas such as all-day dining restaurant, swimming pool, spa, gymnasium and kids’ club. |
Ongoing |
| Browns Raa Resort Pvt Ltd. | Designing and developing of 3 villas up to the operational level in Raa Bodhufarufinolhu island. |
Ongoing |
| Bodhufaru Beach Resort Pvt Ltd. | Designing and developing a 160m harbour capping beam in the North Malé Resort Island. |
Ongoing |
| Bodhufaru Beach Resort Pvt Ltd. | Constructing a 470-room, 5-star beach resort in North Malé Lagoon, the Maldives. The property consists of 265 water villas, 201 beach villas, 3 water suites, and one 1 presidential suite. |
Ongoing |
| NPH Investments Pvt Ltd. | Constructing the proposed Nasadura Hotel and Apartment Complex – a 14-storied 5-star building with 136 hotel rooms and 118 apartment units in Malé, the Maldives. |
Ongoing |
| Browns Ari Resort Pvt Ltd. | Design and construction of a 100-room 5-star beach resort in the Maldives – Adh.Bodufinolhu Island. The resort consists of 30 water villas, 63 beach villas and 6 suites. |
Ongoing |
| Bhoomy Realty Holdings (Pvt) Ltd | Piling Works of Proposed Apartment Complex “OAZI” At Kaduwela |
Completed |
| SLT | Pole Production |
Completed |
| ASB Hospitality | Design of Proposed Renovation to The Melia Whale Lagoon, Maldives. |
Completed |
| National Water Supply & Drainage Board | Painting of Exposed Ductile Iron Pipes & Pipe Supporting Bridge Structure |
Completed |
| Mobitel | Tele-Communication tower foundation, painting & erection, Civil works, grounding works |
Completed |
| Dialog | Tele-Communication tower foundation, painting & erection, Civil works, grounding works |
Completed |
| TODA Coperation | Construction of bored piles and concrete slab in Ingurukade off Ramp |
Completed |
| Browns & Company | Proposed Flagship Showroom for Browns Motors at Kirulapone |
Completed |
| National Water Supply and Drainage Board | Old Water Treatment Plant, Bankiyawatta, Thumbagoda, Balangoda. |
Completed |
| Client | Project Details | Status (Completed/Ongoing) |
|---|---|---|
| Ishara Traders Motor Company (Pvt) Ltd | Browns EV Home Chargers and Commercial Chargers Installation_2025-26 |
Ongoing |
| Huawei Technologies Lanka Company (Pvt) Ltd | Mobitel 5G Upgrade Survey and Installation and RNO Projects_2025-26 |
Ongoing |
| Ericsson Telecommunication Lanka (Pvt) Ltd | Dialog MBB Upgrade and Ericsson Service Model Project_2025-26 |
Ongoing |
| Dialog Network Services (Pvt) Ltd | ID to OD Cabin Conversion Project and Asset Data Collection Project_2025-26 |
Ongoing |
| Dialog Broadband Pvt Ltd | GPON Network development & Enterprise solutions |
Ongoing |
| Dialog Broadband Pvt Ltd | Dialog Optical Fiber Networks Development in DM & DE Sites |
Ongoing |
| Sri Lanka Telecom PLC | OSP unit Rate Contract for Home pass network development _2026 -27 |
Ongoing |
| Sri Lanka Telecom PLC | Unit Rate Contract for FTTH New Connections for year 2026-2027 |
Ongoing |
| ICONIC DEVELOPMENTS (PVT) LTD | Air Conditioners maintenance Services (2025-26) |
Ongoing |
| Huawei Technologies Lanka Co.(Pvt) Ltd | Sri Lanka Hutch Managed Service Field Maintenance |
Ongoing |
| MOBITEL (PVT) LTD | Portable generator Deployment in R-2/R-3/R-7_2025-2028 |
Ongoing |
| DIALOG NETWORK SERVICES (PRIVATE) LIMITED | Air Conditioners maintenance Services, Passive Infrastructure maintenance and Portable Generator operations in Western Region_2024-26 |
Ongoing |
| Sri Lanka Telecom PLC | Supplying customer premises equipment |
Ongoing
View Gallery
|
| Huawei Technologies Lanka Company (Pvt) Ltd | Sri Lanka Dialog IP RAN & Transmission project 2020 |
Ongoing |
| ZTE Lanka (Pvt) Ltd | Mobitel Broadband 4T4R/ SLT LTE Small Cell/ Mobitel L850-Phase3 |
Ongoing |
| Road Development Authority | Conducting a road development project for Access |
Ongoing |
| National Water Supply and Drainage Board | Laying pipes for the Matara Stage IV Water Supply Project (Malimbada Zone-1) |
Ongoing |
| Kalpatharu Power Transmission Limited | Developing and improving the National Transmission and Distribution Network Development |
Ongoing |
| Hutchison Telecommunications Lanka Pvt LTD | Hutch 4G upgrade project |
Ongoing |
| Dialog Broadband Networks (Pvt) Ltd | Dialog Customer Services Enhancement project |
Ongoing |
| Ericson Telecommunication Lanka (Pvt) Ltd | Dialog FDD upgrade – Batch 2 |
Ongoing |
| Mobitel (Private) Limited | Providing maintenance services for Mobitel tower sites |
Ongoing |
| Sri Lanka Telecom PLC | Manufacturing, supplying and delivering poles |
Ongoing |
| Ceylon Electricity Board | Manufacturing, supplying and delivering poles |
Ongoing |
| Bharti Airtel Lanka (Private) Limited | Airtel microwave upgrades |
Ongoing |
| Huawei Lanka Technologies pvt ltd | Executing:
|
Ongoing |
| Mobitel (Private) Limited | Mobitel – IBS Project |
Ongoing |
| Dialog Network Services (Pvt) Ltd | Executing telecommunication installation, passive, OFN and E&E projects. |
Ongoing |
| Sri Lanka Telecom PLC | Installing an accelerated expansion fibre access network: Fibre to the Building Project – (SLT phase 3) |
Ongoing |
| Sri Lanka Telecom PLC | Installing an accelerated expansion fibre access network: ODN Network Development–(SLT phase 3) |
Ongoing
View Gallery
|
| EDOTCO Services Lanka Pvt Ltd | Lamp Pole Project |
Ongoing |
| Huawei Lanka Technologies Pvt Ltd | Sri Lanka Mobitel Engineering Project – 2021 |
Ongoing |
| Huawei Lanka Technologies Pvt Ltd | Sri Lanka Dialog FTK & SWAP project – 2019 |
Ongoing |
| Dialog Broadband Pvt Ltd | Paranthan -Puliyankulam Fiber Backbone Implementation_2025 |
Completed |
| Dialog Broadband Pvt Ltd | Akurana -Mathale Fiber Backbone Implementation_2025 |
Completed |
| ICONIC DEVELOPMENTS (PVT) LTD | Air Conditioners maintenance Services_2024-25 |
Completed |
| Huawei Technologies Lanka Co. (Pvt) Ltd | Sri Lanka Hutch Managed Service Field Maintenance |
Completed |
| MOBITEL (PVT) LTD | Portable generator Deployment in all Island_2022-2025 |
Completed |
| DIALOG NETWORK SERVICES (PRIVATE) LIMITED | Air Conditioners maintenance Services, Passive Infrastructure maintenance and Portable Generator operations in all Island_2020-24 |
Completed |
| Huawei Technologies Lanka Company (Pvt) Ltd | Mobitel 5G Upgrade Survey and Installation and RNO Projects_2022-24 |
Completed |
| Ericsson Telecommunication Lanka (Pvt) Ltd | Dialog MBB Upgrade and Ericsson Service Model Project_2022-24 |
Completed |
| Sri Lanka Telecom PLC | Accelerated Expansion of Fiber Access Network- 200,000 Home Connection_2020 -23 |
Completed |
| Sri Lanka Telecom PLC | Accelerated Expansion of Fiber Access Network ODN Network Development – 400,000 Home Pass Connection_2020 -23 |
Completed |
| Sri Lanka Telecom PLC | OSP Unit Rate Contract for Home pass network development & home connect _ 2023 -24 |
Completed |
| Dialog Network Services (Pvt) Ltd | ID to OD Cabin Conversion Project Phase 1_2022-24 |
Completed |
| Client | Project Details | Status (Completed/Ongoing) |
|---|---|---|
| BIA | Supply, Installation and Cladding of Chilled Water Pipelines, Conditioned Air Duct Lines and Fresh Air Duct Lines at Passenger Terminal Building, Duty Free Shopping Complex, Arrival & Departure Public Concourses at Bandaranaike International Airport, Katunayake – 0127-T-2024 |
Ongoing |
| CHEC | Supply & Installation of Electrical Main Distribution Board System & Diesel Generator System for IT Park and Banking Zone Buildings of Business Centre at Port City Colombo |
Ongoing |
| CCECC-CRCG JV | Meritime Facilation building ELV works |
Ongoing |
| Prashakthi Energy (Wilachchiya) (Pvt) Ltd | Civil , MEP & PEB Structural works for the Wilachchiya 4.5MW Biomass Power Plant, Anuradhapura |
Ongoing |
| Browns Ari Hotel | Installing the CCTV and network system of the property. |
Ongoing |
| Consulting Engineers & Contractors (Pvt) Ltd | Supplying, delivering, installing, testing, commissioning and conducting maintenance of CCTV and storage system, network and VOiP system of the Central Expressway project – Mirigama to Kurunegala |
Ongoing |
| China Telecom Lanka (Pvt)Ltd | Conducting routine maintenance activities for two Huawei fusion model (2000) at BOCC DC. |
Ongoing |
| Ceylon Electricity Board | Installing 14 IP phones as the IP-PABX solution for Distribution Maintenance Office of the Ceylon Electricity Board. |
Ongoing |
| Ceylon Electricity Board | Constructing and maintaining medium and low voltage distribution lines and substations across over 25 locations in Sri Lanka |
Ongoing
View Gallery
|
| Navy | Purchase of Transformer 11Kv/415V/630KVA |
Completed |
| CEB | Construction of Concrete pad & Chimney Foundations for 03 Nos. of Tower Locations – Lot F5 under the Construction of Kothmale – New Polpitiya 220/132kV four circuit Transmission Line |
Completed |
| Browns Investment | Huawei Technical Service and Commissioning Support for Nasandhura Hotel and Apartment Project |
Completed |
| Browns Hotels & Resorts | Supply, Install, Test, Commission And Remedy Any Defects Of Electrical & ELV System For Proposed Three Tips Hotel At Ella |
Completed |
| China Habour | Supply & Installation of Heating, Ventilation and Air Conditioning Systems (HVAC) for IT Park and Banking Zone Buildings of Business Centre at Port City Colombo |
Completed |
| Navy-LRH | Supply, Installation, Testing and Commissioning of Medium Voltage Distribution System of Cardiac and Critical Care Complex at Lady Ridgway Hospital |
Completed |
| Bank of China – Colombo Branch | Installing Smart Li batteries at the Colombo branch of Banka of China housed in the Cargills Building, Colombo, Sri Lanka. |
Completed |
| China Harbor Engineering Company Ltd (CHEC) | Providing network and CCTV facilities for the CHEC office located- across two floors of the World Trade Centre, Colombo, Sri Lanka. |
Completed |
| Client | Project Details | Status (Completed/Ongoing) |
|---|---|---|
| Colombo Marina Development (Pvt) Ltd. | Provision of comprehensive Project Management Consultancy (PMC) Services for the planning, design, procurement, construction, testing, commissioning, and handover of a landmark mixed-use marina-front development delivered under a Design & Build Contract. The development comprises:
|
Ongoing |
| Riverina Resorts Pvt Ltd. | Browns Engineering is appointed as the Project Management Consultant for the balance construction of a 359-room resort, providing project management services covering design development, BOQ and tender documentation, tendering, construction monitoring, and contract administration through to completion |
Ongoing |
| Browns Raa Resorts (Pvt) Ltd (BRR) | Browns Engineering is proposed as the Project Manager, providing end-to-end project leadership from inception through to completion. Our services include design development and coordination, BOQ preparation, tender documentation and procurement support, construction monitoring, and contract administration |
Ongoing |
| Bodufaru Beach Resorts (Pvt) Ltd (BBR) | The project is managed by Browns Engineering & Construction as the Project Management Consultant with Sinohydro Corporation Ltd., appointed as the Main Contractor and Barceló Hotel Group as the Resort Operator. Browns Engineering overseas the project from design development and procurement through construction monitoring and contract administration ensuring coordinated delivery in line with the project’s quality, programme, cost and operational requirements. |
Ongoing |
| NPH Investments Pvt Ltd | The project was managed by Browns Engineering & Construction as the Project Management Consultant with Zhongtian Construction Group, appointed as the Main Contractor and Barcelo Hotel Group as the Resort Operator. Browns Engineering & Construction managed the project from design development and procurement through construction monitoring and contract administration with a focus on cost control, design review, quality control, programme management and coordinated delivery in line with the project’s operational requirements. |
Completed |
| Client | Project Details | Status (Completed/Ongoing) |
|---|---|---|
| Meliá Whale Lagoon, Maldives | A 100-villa beachfront resort designed to harmonize with the pristine Maldivian environment. Browns Engineering led the architectural design and coordination, collaborating with the hotel international operator and consultants, including Spanish architects and interior designers. The project focuses on sustainable luxury, creating a serene retreat that blends natural beauty with refined comfort. |
Completed
View Gallery
|
| Indonesian Embassy | Architectural designing and implementation work at the Indonesian Embassy enhances the Reception Area and Cultural Center, creating a more welcoming, functional, and elegant environment. Delivered by our Architectural Division, the upgrade preserves cultural essence while improving comfort, functionality, and overall spatial quality. |
Completed
View Gallery
|
View Gallery